MENU

AquaPure Future Series

28 July 2025

Modular assembled water tank

Through professional simulation modeling, mechanical calculation, pressure resistance, anti-leakage and anti-corrosion testing, several standardized water tank bolt assembly modules are designed. The corresponding number of water tank modules can be directly assembled on the project site according to the project processing volume, so that the factory pre-produces components, the on-site installation is convenient, the later expansion is flexible, and the operation is efficient and stable.

28 July 2025

Containerized integrated equipment room

By integrating a single set of equipment in the system into standard containers of different sizes, a high degree of integration is achieved, eliminating the need for civil construction to build a separate equipment room, greatly saving project space and project time, while making transportation and expansion easier.

28 July 2025

External equipment

such as diffused air flotation machines, drum filters, mechanical grilles, cooling towers and other equipment. On-site construction only requires the equipment to be stacked at the designated location and connected to the pipelines before operation.

◎ 2025 Beijing Bianhuadian Chemical Analytical Instruments Co., Ltd.. All Rights Reserved.

京ICP备14049029号-1